Bathroom renovation Ellicott City MD
A new client contacted us after a renovation we did for his good friend. He wanted to remodel the entire master bathroom. Immediately, we saw that bathroom layout and fixtures were in need of an update. We tore down a wall to enlarge and replace the shower, replaced a deck tub with a free-standing tub, and moved a vanity. All the fixtures were replaced according to the client‘s preferences. The renovation took three weeks, and the client loved the final result.